The reason the NEC CMP 12 added these requirements, as shown in the panel statements, directly relates to the concern that elevator controllers can be installed in locations where the available fault current can be high and the inspector may not be able to clearly determine the SCCR of the elevator controller unless it is marked on the equipment. Part VIII, Machine Rooms, Control Rooms, Machinery Spaces, and Control Spaces, states elevator and similar-installation driving machines, motor-generator sets, motor controllers and disconnecting means are to be installed in a room or space set aside for that purpose. Such design innovations require sophisticated wiring strategies. You are a subscriber that needs to Sign In. Escalator Pit Light and Receptacle 620.23 | Mike Holt's Forum Indeed, most elevator accidents involve maintenance workers, yet even theirs is not an excessively dangerous profession. It is further stipulated that internal voltages of power-conversion equipment and functionally associated equipment, and the operating voltages of wiring interconnecting the equipment, are permitted to be higher, provided that the equipment and wiring are listed for the higher voltages. The light switch shall be located so to be accessible from pit access door. To safeguard the passengers and electrical equipment, ASME A17.12.8.2.3.2 requires the power source to the elevator control panel to shut down prior to the discharge of water from a sprinkler head. This position paper is written to provide guidance to members whose employees are engaged in elevator-industry work that might expose them to arc-flash hazards, and to assist members in complying with applicable OSHA and National Fire Protection Association (NFPA) standards. Furthermore, at least one 125-V, single-phase, 15- or 20-amp duplex receptacle is to be provided in each machine room or similar location. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data. I've never run into this before. Feeders may be installed within the hoistway where the elevator has a driving-machine motor in the hoistway or on the car or counterweight. This is important as the tradition of using only time-current curves for the analysis of overcurrent device operation is usually not sufficient since the time-current curves traditionally stop at 0.01 second (not time zero). They are to be located so as to be protected from physical damage, are to be of a flame-retardant type, and must be part of listed equipment, a driving machine or a driving-machine brake. Next, with multiple elevator banks, the controller will usually allow only one elevator at a time to operate, reducing the amount of emergency power required. Notwithstanding, if sprinklers are installed in hoistways, machine rooms or the like, the disconnecting means is permitted to automatically open the power supply to the affected elevator(s) prior to the application of water. Hydraulic reservoir characteristic of a hydraulic-piston-operated elevator. Traction elevators raise and lower the elevator cab with cables, a pulley system, and counter weights powered by a motor at the main drive wheel. Besides the power-supply disconnect discussed, it is provided that elevators have a single means for disconnecting all ungrounded car lights, receptacles and ventilation power-supply conductors for that elevator car. To avoid this situation, designers can specify elevator controls with a safety feature commonly called a rescuvator. Follow the manufacturers instructions and precautions. Because of this, several manufacturers offer an all-in-one shunt trip elevator disconnect switch that includes all the prewired accessories needed to comply with the various Code sections. A section on branch circuits for car lighting, receptacles, ventilation, heating and air-conditioning contains a number of important provisions. IAEI News Magazine. The code notes that elevator rails or other hoistway equipment are not to be used as the grounding conductor for lightning-protection systems. These are the principle NEC 2011 Article 620 mandates. Required lighting shall not be connected to the load side of a ground-fault circuit interrupter. PDF Elevator Safety Program - Technical Clarification (A) Separate Branch Circuit. For just $7.99 per month, you can gain access to more than 5,000 articles from all Elevator World Publications, this includes EW Global, EW Europe, EW India, EW Middle East, EW Turkey, and EW UK. U.S. Latham, NY Shopping Miscellaneous Retail Stores, NEC Wheelchair lifts EazyLift Elevators, . employees shall not perform any work on equipment where there is a potential to come in contact with energized mechanical or electrical hazards until all sources of energy have been de-energized, grounded or guarded.. All rights reserved. [emailprotected] The cover shall be secured and level with the pit floor. Elevator cab lights require emergency back-up power. APPENDIX A 2.2. Additionally, ampacities of the individual conductors and flame-retardant properties of the overall cable are important factors. If you specify a rescuvator, you must also specify a disconnect switch with an auxiliary contact that opens when the disconnect arm moves to the open position, but stays closed when the OCPD trips. You need at least one 120VAC GFCI-protected receptacle at each location. To achieve flexibility and endurance, traveling cable is more finely stranded and, where possible, separated into discrete conductors. Supports for cables or raceways in a hoistway or in an escalator or moving-walk wellway or platform lift and stairway chairlift runway must be securely fastened to the guide rail, escalator or moving-walk truss, or to the hoistway, wellway or runway construction. GFCIs in elevator pits During an inspection of the elevators in a commercial building, the state inspector failed us for using a GFCI-type circuit breaker to protect a receptacle in the elevator pit. Per the 2017 NEC, if the elevator is designated as an emergency system load, the disconnect must be protected by a surge protective device (SPD). above the seal plate, adjacent to the ladder. As such, elevator controller manufacturers should make the effort to rethink their designs to avoid costly system design changes. Get directions, reviews and information for Eazylift Albany LLC in Latham, NY. Mobile, AL 36606 USA A raceway that comes loose on the inside of a hoistway could catch on a moving car, causing immense damage and hazard to users. For example, it is stated that the cross-sectional area of the individual conductors in a wireway are not to exceed 50% of the interior cross-sectional area of the wireway. The traveling cable, of necessity, is exempted. The basic rule for conductor fill of a metal wireway, as given in Article 376, is that the sum of the cross-sectional areas of all contained conductors at a cross section of a wireway is not to exceed 20% of the interior cross-sectional area of the wireway. This may be countered by providing good machine-room ventilation. First, the traveling cable must be composed of very fine-stranded conductors so it can flex with a minimum of internal stresses, ensuring long service life and reliability. Section 620.62, Selective Coordination, is central to multi-elevator installations and must be closely observed. Cross-sectional areas of conduits are given in Chapter 9, Table 4. Traditional wiring methods and materials come into play, as always, but it is necessary to rethink their deployment. ), a duplex 15A 120-volt receptacle in pit with ground- fault circuit protection and a 15A 120-volt Non GFCI receptacle for the sump pump. NEC Article 620 Part IV, Installation of Conductors, contains key mandates for elevator wiring. Sign up for our free e-newsletter. You may go up to 600 V for power circuits supplying door-operator controllers and door motors, branch circuits and feeders to motor controllers, driving-machine motors, machine brakes and motor-generator sets. Thus, the need for door interlock functionality is recognized. If the entire feeder/branch circuit assembly were to be protected in the conventional manner, the motor would cut out long before reaching operating speed. All Rights Reserved | Contact Us | Privacy Policy. Elevator PITS | Mike Holt's Forum The fan should be on a dedicated circuit. Something went wrong. GET YOUR CEUS TODAY, 1998-2021. Corporate Office In all cases, the working space must permit at least a 90 opening of equipment doors or hinged panels. In addition, the shunt-trip voltage must also be monitored by the Fire Alarm System. In order to aid enforcement, the panel additionally required marking the available fault current at the elevator controller. Examples of PPE that may be appropriate are non-conductive eye protection, clean leather or fire-resistant gloves, and natural-fiber or fire-resistant-rated long-sleeved shirts and pants, or fire-resistant-rated long-sleeved coveralls. One. Elevator Pit Requirements | Mike Holt's Forum Section 620.37 re-emphasizes that only wiring used in connection with the elevator is permitted within the hoistway, machine room, control room/machinery space or control space. 3. Elevator Pit Sump Pump Electrical Requirements After reading this article, you should have learned: Which locations require sepa-rate, dedicated branch circuits Which branch circuits are not to be provided with ground fault circuit interrupter (GFCI) pro-tection Which locations must have one or more duplex receptacles Where overcurrent protection for hoistway, pit and machine-room lighting must be located How unsupported lengths of traveling cables are measured. Flexible cords and cables part of listed equipment operating at 30 V (42 VDC) or less, similarly supported and protected, jacketed and flame retardant, are permitted. If elevators are supplied by the emergency, legally required standby or critical operation power systems, then selective coordination is required per the 2017 NEC in 700.32, 701.27 or 708.54. The main concern is to ensure that workers may escape to safety in the awful circumstance of an arc-fault event. (All intentionally grounded elements must be held at equal potential.) In a time when increasing value is placed on even small amounts of real estate, elevator design must strive to configure, efficiently control and drive elements to whatever degree possible, and that is the thinking behind some alternate locations for these structures. Moreover, it is necessary to consider future worker safety for an indefinite period. ranged from 0.06 cal/cm2 to 0.95 cal/cm2, which indicates that the arc-flash hazard to employees is primarily to the hands and arms. If we fast forward more than 36 centuries, we see some important new developments in elevator technology. Selective coordination is also required for multiple elevators per NEC 620.62. Other terms defined in NEC Article 620 are Control System, Motion Controller, Motor Controller, Operation Controller, Operating Device and Signal Device. A traditional elevator installation (which includes a machine room) requires access inside the elevator shaft. Where necessary, it is mandated that suitable guards be provided to protect the cables against damage. If your specifications require a vent at the top of the shaft for venting smoke, you must provide a key switch with a pilot light to control that vent. h-`7 It is further stressed that no provision is to be made to open or close the disconnecting means from any other part of the premises. For example, wiring that is under exclusive utility control and has to do with the generation and distribution of electrical power is not NEC regulated. 0 EazyLift Elevators, Stairlifts, Wheelchair Lifts & Ramps. A single dedicated receptacle supplying a permanently installed sump pump does not have to be a GFCI type. If it kills the son of the owner, the son of that builder shall be put to death.. Sign up for our free e-newsletter. (To design and install an elevator for a Class I, Division 1 location would be quite an undertaking.). Many professionals believe the NEC is applicable only for voltages over a certain level, but that is not the case. 953 0 obj <> endobj NEC Article 620: Elevators, Part 2 - Elevator World, Inc. Traction elevators are typically installed in a bank of elevators where fused switches, or circuit breakers in a panelboard are located in the machine room serving the bank of elevators. Generally, it is decreed that the supply voltage is not to exceed 300 V between conductors (allowing for the familiar 240-V concept), although there are exceptions. All equipment in a machine room-less design is installed within the elevator shaft or exterior compartment near the elevator shaft, including the elevator controller and the elevator disconnecting means. This is not the elevator companys responsibility. Flexible cords and cables in lengths not to exceed 6 ft. of a flame-retardant type and located to be protected from physical damage are permitted in machine rooms without being installed in a raceway. For just $7.99 per month, you can gain access to more than 5,000 articles from all Elevator World Publications, this includes EW Global, EW Europe, EW India, EW Middle East, EW Turkey, and EW UK. The electrical energy does not traverse the human body, but proximity to the explosion means severe injury is possible from the intense heat and concussive shockwave. NEC 2011 Article 620.21(2)(b) states that hard-service cords and junior hard-service cords that conform to the requirements of Article 400 (Table 400.4) are permitted as flexible connections between the fixed wiring on the car and devices on the car doors or gates. Personal protective equipment (PPE): Use appropriate PPE to protect body parts within the range of 3-16 in. Moreover, because motors have a higher starting current than other loads, the overcurrent protection protocol is unique to them and somewhat counterintuitive. The AHJ is saying that this is a violation of 620.23. Cloudflare Ray ID: 7a2fbe9ebd7e2fe8 In addition, requirements for selective coordination and shunt tripping should be complied with as needed for the installation. For all of this to come together in the real world, there had to be some assurance that these new technologies could be used safely on a wide scale. Later in the 19th century, Thomas Edison and his associates built an electrical distribution system in Lower Manhattan. The light switch for the equipment room must be adjacent to the entrance door on the latch side. This device must be either a fused disconnect or a circuit breaker because ANSI/ASME A17.1 requires you to install an additional overcurrent protection device (OCPD) in the elevator equipment room. Similarly, underground wiring in mines is not NEC regulated, although other, non-mine wiring below ground (such as lighting in an underground traffic tunnel) is covered. This accomplishes two functions. Motor feeder short circuit and ground-fault protection must be as required in Article 430, Part V for all motors. Use Underwriters Laboratories or Canadian Standards Association-labeled scopes tested for 1,000 V. Lockout/tagout: When troubleshooting is complete and further work can be accomplished without the equipment being energized, follow the lockout/tagout procedures in Section 7 of the. Here are 23 ways that both chapters and the national office can meet todays major challenge of making members feel valued, IAEIs Online Training allows you to learn at your own pace or live with an expert instructor, from the comfort of your laptop or PC. Motor controllers are permitted outside the spaces specified above. As always, the best advice in all instancesdo your homework, communicate often, and document decisions made. Even though Edison grasped the basic ideas of fusing and overcurrent protection, many hazards remained. In Part One of this series (ELEVATOR WORLD, April 2012), we began an examination of National Electrical Code (NEC) 2011 mandates for elevators and related equipment installations. On existing or listed equipment, conductors are permitted to be grouped together and taped or corded without being installed in a raceway. Section 725.45 concerns the location of overcurrent devices and provides for feeder and branch-circuit taps, transformer primary side overcurrent device location and overcurrent device location at the input side of electronic power sources. These must also be insulated for the maximum voltage applied to any conductor within the cable or raceway system. PDF C.1 General Requirements for All Elevator Installations You'll be responsible for specifying the items related to the fire alarm and some controls, as well as supplying lighting and power to the equipment room and elevator pit. Design practices that are acceptable in some jurisdictions may not be in others. If the equipment must remain energized to perform work, effective insulation and safe electrical working practices should be observed. . This room is to be secured against unauthorized access (kept locked). Firefighters can then use portable telephone handsets in combination with the jacks and cabling. Click to reveal A surge of immigration to the U.S., the end of slavery and, on both sides of the Atlantic Ocean, a burgeoning industrial revolution ignited an acceleration in new building. Hazards created by water, snow or condensation in the work area can cause slips, falls and accidental contact.
Mobile Patrol Pamlico County, Hawaii Hurricanes Before 1950, Accident On Hwy 57 Wisconsin Today, How Do You Know Serrapeptase Is Working, Articles N